Skip to main content

EV SocietyElectric Vertical, Aerospace, Defence & Space Research Organisation

Flagship Certification

Certified Electric Vertical Technology Officer (EVTO™)

The Gold Standard for Electric Vertical Technology Leadership

Why EVTO™?

Shaping the Future CTOs of Electric Mobility

The EVTO™ program is an executive-grade certification designed for engineering leaders, architects, and founders who want to master the end-to-end Electric Vertical (eVTOL) ecosystem. From battery dynamics to AI-driven operations, this program shapes the CTOs of the future.

  • The Electric Vertical Technology Officer (EVTO) is a high-level strategic technologist responsible for the entire lifecycle of Electric Vertical (eVTOL) products and platforms.

  • They bridge the gap between hardware engineering (battery, electric propulsion) and software intelligence (AI, cloud, data).

  • They make high-stakes architectural decisions that impact safety, profitability, and user experience.

Program Document

Certified EV Technology Officer (EVTO™).pdf

Updated: 2026-01

View / Download (opens in a new tab)

01Eligibility

  • Proven experience in architectural design (Software, Hardware, or Systems).
  • Demonstrated managerial or technical leadership experience.
  • Passion for the Electric Vertical (eVTOL) ecosystem.

More eligibility criteria will be added later. Admission is selective.

02Tracks

Executive Track6 Months

CTOs, VPs, and Founders looking to sharpen their strategic edge.

Professional Track9 Months

Senior Engineers and Architects transitioning into leadership roles.

Fellowship Track12 Months

Researchers and Academics focusing on deep-tech innovation.

03Certification

  • Completion of all 5 Pillars and associated artifacts.
  • Successful submission and defense of the Capstone project.
  • Review and approval by the EV Society certification board.

Learning pathway

From eligibility to capstone

  1. StartEligibility & Prerequisites2 Weeks
  2. Pillar 1Electric Vertical System Ownership3 Weeks
  3. Pillar 2AI & Digital Intelligence3 Weeks
  4. Pillar 3Electric Vertical Battery4 Weeks
  5. Pillar 4CTO Grade System3 Weeks
  6. Pillar 5Business Magnate2 Weeks
  7. Final GateCapstone Project

Program Structure

5 Pillars of Excellence

Eligibility & Prerequisites2 Weeks

Eligibility & Prerequisites

"How do you design a system that is sustainable, scalable, and commercially viable?"

Key Outcomes

  • Mastery of eVTOL system-of-systems architecture.
  • Ability to make trade-offs between cost, range, payload, and performance.
  • Understanding of green energy principles and carbon footprint reduction.

Required Artifacts

  • Architectural Design Portfolio / Case Studies
  • Green Leadership Statement
Pillar 13 Weeks

Electric Vertical System Ownership

"Do you truly own the engineering behind the aircraft?"

Key Outcomes

  • Deep dive into electric propulsion selection and optimization.
  • Airframe integration and flight dynamics.
  • Safety critical systems and failure mode analysis.

Required Artifacts

  • Electric Vertical System Comparison Matrix
  • Electric Vertical Architecture Review Document
  • Safety Risk Register
Pillar 23 Weeks

AI & Digital Intelligence

"How do you transform an aircraft into an intelligent agent?"

Key Outcomes

  • Integrating AI/ML for predictive maintenance and range estimation.
  • Digital Twin implementation for fleet monitoring.
  • Cloud-native architectures for connected aircraft fleets.

Required Artifacts

  • AI vs Rule-based Decision Map
  • AI System Architecture for Electric Vertical Ops
  • RAG + Agent Flow Design
Pillar 34 Weeks

Electric Vertical Battery

"Is the heart of your eVTOL safe and efficient?"

Key Outcomes

  • Cell chemistry selection and pack design.
  • BMS algorithms and thermal management strategies.
  • Battery lifecycle management and second-life applications.

Required Artifacts

  • Battery Safety Decision Checklist
  • Thermal Runaway Prevention Framework
  • Battery Aadhaar Lifecycle Map
Pillar 43 Weeks

CTO Grade System

"Can you build an organization that builds eVTOL aircraft?"

Key Outcomes

  • Setting up engineering processes and quality gates.
  • Supply chain strategy and component sourcing.
  • Regulatory compliance and type-certification roadmap.

Required Artifacts

  • End-to-End Electric Vertical Platform Architecture
  • Architecture Decision Records (ADR)
  • Risk & Compliance Mapping
Pillar 52 Weeks

Business Magnate

"Can you turn technology into a market-dominating business?"

Key Outcomes

  • Developing a profitable Electric Vertical business model.
  • Go-to-market strategies for air taxi, cargo, and emergency-response segments.
  • Investment planning and ROI analysis.

Required Artifacts

  • Electric Vertical Business Model Canvas
  • Platform Dominance Strategy
  • 10-Year Technology Roadmap
Final Gate

Capstone Project

The Capstone project is the final gate for certification. It requires synthesizing knowledge from all pillars into a cohesive, defense-grade solution.

Deliverables

  • Capstone Proposal
  • System Architecture + Diagrams
  • AI Integration Plan
  • Business & Scaling Roadmap

Evaluation Criteria

  • Technical Depth & Feasibility
  • Innovation & Originality
  • Business Viability
  • Clarity of Presentation

Example Topics:

  • AI-driven Electric Vertical Battery Safety System
  • Next-Gen Urban Air Mobility Platform
  • Autonomous eVTOL Cargo Fleet Architecture

Current Candidates

Leaders currently enrolled in the program